Full Scope Site Evaluation
Scope:
This
evaluation provides a detailed assessment of performance for the entire process
as a system.
Detail:
Establish "As-Is" Performance
It is vital
that an accurate "As-Is" be established as a comparison against any future
changes, otherwise it becomes difficult to determine potential value or measure
the degree of success for an implemented change. Since a change in any given
segment of an aggregates operation has the potential to impact the performance
of other segments, it is important that "As-Is" measurements be
accurately established for each element of the production process affected by
change.
Validate
Production Models
This is done using
field observation including, cycle time measurement, belt scale output, gradation
sampling, equipment setup, configuration verification, historical performance
data, etc. As with any software or
computer based modeling system, it is critical that the data going in
realistically represents current conditions. In particular it should never be
presumed that output from AggFlow represents anything more than an estimate
based on manufacturer performance projections until field data can be
substituted at critical stages within the model.
Establish
"System Design Capacity"
The “Design Capacity”
of each element of the production process is established within the validation
procedure by calculating the maximum achievable rate of production that can be
expected for each process segment under optimal conditions. The “System
Design Capacity” is established by the process element(s) that, under optimal
conditions, limit the overall performance of the production process.
Identify
Performance Defects
Comparison of Design
Capacity to current results for each element of the production process will
identify potential for improvement. It is extremely rare that the combination
of identifiable defects will not represent in excess of 20% potential for
performance improvement.
Results:
An initial
report is provided detailing all relevant field measurements and
observations. The report specifically
focuses on issues currently limiting performance. Recommended improvements are identified along
with the performance effect of each item on overall system capabilities. Additional field data needed to validate the
performance of each stage of the production process is listed along with any
other data needed to establish the value of recommended upgrades.
Time & Cost:
Cost
for the comprehensive site assessment is site dependant but invariably is
offset many times over by the value of results.
Initial on-site time is generally less than 5 days but can vary
substantially depending on size, complexity, previously available data and site
participation.
Initial
Site Evaluation
Scope:
This evaluation is intended to generally assess an operation to
identify issues currently limiting performance.
Detail:
The initial assessment can be limited to the crushing and screening
systems only or can include pit operations depending on client preference. Process flow details are reviewed including
equipment configuration and setup for standard operating modes. An AggFlow model is created if one does not
exist and evaluated for accuracy. Field
observations are made to verify details within the process flow model and to
verify current performance limitations.
Results:
An initial report is provided detailing relevant field measurements and
observations specifically focused on issues currently limiting
performance. Additional field
measurements needed to validate the performance of each stage of the production
process are listed along with any other data needed to establish the practical
design capabilities of the processing systems.
Time & Cost:
Time and cost for the initial site assessment
ranges between $2,500 and $10,000 depending on included scope, operation size,
previously available data and site level participation. Initial on-site time is generally between 1
and 3 days. Your satisfaction is
guaranteed. If not satisfied with the
value of the services provided, your cost is limited only to the actual cost of
travel.